Sellwood Bridge Field Work Notice - February 9, 2017

Donation to Sellwood Middle School

Donation to Sellwood Middle School

Sellwood Bridge from SE in snow Jan 2017 by Dan O'Flaherty

Sellwood Bridge from SE in snow Jan 2017 by Dan O'Flaherty

Field Work Notice - February 9, 2017

Old Sellwood Bridge in the News:  Rachel Ginocchio is the parent of a student at Sellwood Middle School. When the old Sellwood Bridge was taken down, Rachel asked the contractor for some debris from the old bridge.  She and her artistic friends turned that debris into keepsakes and items like bottle openers that were sold. Last week the group donated $7,800 raised from their sales to Sellwood Middle School. 

The donation was announced at the dedication ceremony for a section of old Sellwood Bridge railing that is now in front of the Sellwood Moreland Improvement League’s (SMILE) building on SE 13th Ave. at SE Tenino St.  Thanks to our general contractor the Slayden-Sundt Joint Venture for donating the bridge debris and railing for these worthwhile community causes.

WEST SIDE WORK

Cemetery: Week of Feb. 13: regrade and repair gullies on slopes on north and south sides of entrance road from Hwy 43.

Macadam Bay: Week of Feb. 13: re-grade and repair gullies around Macadam Bay sign at entrance and along retaining wall on the west side of the driveway, and install erosion control measures.

Old Staff Jennings Site: Week of Feb. 21: re-grade sediment and gullies, install compost and erosion control measures around landscaped area on north side of bridge.

Powers Marine Park: Week of Feb. 21: re-grade areas in park north of bridge and install erosion control measures.

EAST SIDE WORK

Tacoma & 6th Signal: On Thursday, Feb. 9 the contractor will work on the traffic signal during off-peak day hours.  Left turns from Tacoma St. to 6th Ave. will not be permitted for several hours during the work, so drivers will need to turn at streets east of 6th Ave.

CONSTRUCTION WORK HOURS

Weekday work hours are typically 7 am to 5 pm weekdays.  No weekend work is scheduled.

For More Information – Contact Mike Pullen at 503-209-4111.  For construction noise issues, call 503-988-4884.