Field Work and Construction Updates

Updated January 27, 2017: With major construction work now complete, there will no longer be a weekly Field Work Notice. Notices will be posted in 2017 if important field work is scheduled.

Sellwood Bridge Field Work Notice for December 30

Green wall at Stephens Creek & Macadam Bay driveway.

TRAFFIC ALERTS

Now that the deck of the new bridge is complete, a construction entrance will be added at the east end of the bridge. Expect minor traffic delays between 9 am and 4 pm on Jan. 6 when the entrance is added. Concrete barriers will be replaced with barricades that can be moved when trucks enter the work zone. This is a construction entrance only, so be cautious of construction vehicles entering and exiting on the bridge. The outside southbound lane of Hwy. 43 is closed north of the bridge from 7 am to 4 pm on weekdays.

(more)

Sellwood Bridge Field Work Notice for December 23

Scoring pattern on new bridge sidewalk

TRAFFIC ALERTS

  • The outside southbound lane of Hwy. 43 is closed north of the bridge from 7 am to 4 pm on weekdays.
(more)

Sellwood Bridge Field Work Notice for December 17

Installing storm drain to east side bioswale

Field Work Notice - December 17, 2015

TRAFFIC ALERTS

  • The northbound lane of Hwy. 43 now uses the new interchange ramps and the southbound through lane travels under the new bridge (see article on project website). This will continue until summer 2016. Southbound traffic uses the right outside lane to access the bridge (not the left lane as before). The left lane is used for through traffic (Portland to Lake Oswego). “No turn on red” signs have been added at the interchange to reduce conflicts between motor vehicles and crosswalk users.
  • The outside southbound lane of Hwy. 43 is closed north of the bridge from 7 am to 4 pm on weekdays.
(more)

Sellwood Bridge Field Work Notice for December 10

Plastic visquine is set down after concrete deck pours for temperature control and rain protection

Plastic visquine is set down after concrete deck pours for temperature control and rain protection.

Field Work Update - Posted December 11, 2015

TRAFFIC ALERTS

  • The northbound lane of Hwy. 43 now uses the new interchange ramps and the southbound through lane travels under the new bridge (see article).  This will continue until summer 2016. Southbound traffic uses the right outside lane to access the bridge (not the left lane as before). The left lane is used for through traffic (Portland to Lake Oswego).  “No turn on red” signs have been added at the interchange to reduce conflicts between motor vehicles and crosswalk users.
  • The outside southbound lane of Hwy. 43 is closed north of the bridge from 7 am to 4 pm on weekdays.
  • Other Projects: The west side detour for bicycles and pedestrians has been extended along the west sidewalk of SW Macadam Ave. north from SW Nevada St. to SW Nebraska St., due to a Portland Water Bureau project in Willamette Park.  At Nebraska St. bicyclists and pedestrians can rejoin the regional trail. The detour will be in place until the project is completed next spring.
(more)

Sellwood Bridge Field Work Notice for December 4

View of bridge from the west

View of bridge from the west

Field Work Update - December 4, 2015

TRAFFIC ALERTS

  • A major traffic change was made to the Hwy. 43 interchange with the bridge in November. The northbound lane of Hwy. 43 now uses the new interchange ramps and the southbound through lane travels under the new bridge (see article on project website).  This will continue until summer 2016. Southbound traffic uses the right outside lane to access the bridge (not the left lane as before). The left lane is used for through traffic (Portland to Lake Oswego). Drivers should check crosswalks in the intersection before turning right on red to avoid conflicts with pedestrians and bicyclists.
  • A concrete deck pour is scheduled to begin at 3 am Saturday, Dec. 5 with  trucks accessing the work zone from SE Tacoma St. and SE Spokane St.
  • The outside southbound lane of Hwy. 43 is closed north of the bridge from 7 am to 4 pm on weekdays.
  • Other Projects: The west side detour for bicycles and pedestrians has been extended along the west sidewalk of SW Macadam Ave. north from SW Nevada St. to SW Nebraska St., due to a Portland Water Bureau project in Willamette Park.  At Nebraska St. bicyclists and pedestrians can rejoin the regional trail. The detour is in place until the project is completed next spring.
(more)

Sellwood Bridge Field Work Notice for November 25

Preparing Span 5 for concrete deck pour

Week of November 25, 2015

TRAFFIC ALERTS

  • A major traffic change was made to the Hwy. 43 interchange with the bridge on Nov. 17. The northbound lane of Hwy. 43 now uses the new interchange ramps and the southbound through lane travels under the new bridge (see article).  This will continue until summer 2016. Southbound traffic uses the right outside lane to access the bridge (not the left lane as before). The left lane is used for through traffic (Portland to Lake Oswego). The traffic signal has been adjusted to improve traffic flow. Drivers should check crosswalks in the intersection before turning right on red to avoid conflicts with pedestrians and bicyclists.
  • On Monday, Nov. 30 a concrete deck pour is scheduled from 8 am to late afternoon with concrete trucks accessing the work zone from SE Tacoma and SE Spokane St.
  • The outside southbound lane of Hwy. 43 is closed north of the bridge from 7 am to 4 pm on weekdays.
(more)

Sellwood Bridge Field Work Notice for November 19

Stage 6 A traffic plan at Hwy 43 & bridge

Field Work Update - November 19, 2015

TRAFFIC ALERTS

  • A major traffic change was made to the Hwy. 43 interchange with the bridge on Nov. 17 (see graphic to the right). The northbound lane of Hwy. 43 now uses the new interchange ramps and the southbound through lane travels under the new bridge (see article on project website). This will continue until summer 2016. Southbound traffic uses the right outside lane to access the bridge (not the left lane as before). The left lane is used for through traffic (Portland to Lake Oswego). The southbound TriMet bus stop by the cemetery is closed until summer. Shifting the traffic creates space for the contractor to build the second through lane under the bridge.
  • The outside southbound lane of Hwy. 43 is closed north of the bridge from 7 am to 4 pm on weekdays.
(more)

Sellwood Bridge Field Work Notice for November 12

Stage 6 A traffic plan at Hwy 43 & bridge.

Field Work Update - November 12, 2015

Major Traffic Change in November

The contractor is preparing for a major traffic change this month when the northbound lane of Hwy. 43 will shift onto the new interchange ramps and the southbound through lane will be routed under the new bridge (see article on project website). In the new stage, southbound traffic will use the right outside lane (not the left lane used now) to access the bridge. The left lane will be for through traffic. The southbound TriMet bus stop by the cemetery will close on Nov. 16 and not reopen until summer 2016. Shifting the traffic will create space for the contractor to build the second through lane under the bridge. The tentative date for the traffic change is Tuesday, Nov. 17, weather permitting. An email will be sent to our project list and posted to the project website when the date is confirmed.

TRAFFIC ALERTS

  • The outside southbound lane of Hwy. 43 is closed north of the bridge from 7 am to 4 pm on weekdays.
(more)

Sellwood Bridge Field Work Notice for November 6

Installing hand rail on the parapet for the northeast ramp to Hwy 43

Field Work Update - November 6, 2015

Major Traffic Change in November

The contractor is preparing for a major traffic change this month when the northbound lane of Hwy. 43 will shift onto the new interchange ramps and the southbound through lane will be routed under the new bridge (see article on project website). In the new stage, southbound traffic will use the right outside lane (not the left lane used now) to access the bridge. The left lane will be for through traffic. The southbound TriMet bus stop by the cemetery will close on Nov. 16 and not reopen until summer 2016. Shifting the traffic will create space for the contractor to build the second through lane under the bridge. This traffic change is expected to happen the week of November 16, weather permitting.

TRAFFIC ALERTS

  • The outside southbound lane of Hwy. 43 is closed north of the bridge from 7 am to 4 pm on weekdays.
  • Concrete truck deliveries will access the east work bridge via SE Spokane St. and SE Tacoma St. on Tuesday, Nov. 10 and Friday, Nov. 13, weather permitting. Truck traffic is expected from 3 am to 11:30 am.
(more)

Sellwood Bridge Field Work Notice for October 30

Crews set up the Bidwell machine for a concrete deck pour on Span 3

Field Work Update - October 30, 2015

Major Traffic Change in November

The contractor is preparing for a major traffic change in November, when the northbound lane of Hwy. 43 will shift onto the new interchange ramps and the southbound through lane will be routed under the new bridge (see article on project website). Shifting the traffic will create space for the contractor to build the second through lane under the bridge. In the new stage, southbound traffic will use the right outside lane (not the left lane used now) to access the bridge. This traffic change will be rescheduled for later in November.

TRAFFIC ALERTS

  • The outside southbound lane of Hwy 43 is closed north of the bridge from 7 am to 4 pm on weekdays.
  • Concrete truck deliveries will access the east work bridge via SE Tacoma St. and SE Spokane St. on Tuesday, Nov. 3 and Friday, Nov. 6, weather permitting. Truck traffic is expected from 3 am to 11:30 am.
  • Work on a storm drain line on SE Spokane St. is postponed to spring 2016.
(more)

Sellwood Bridge Field Work Notice for October 22

First main river span deck pour

Field Work Update - October 22, 2015

Major Traffic Change in November

The contractor is preparing for a major traffic change in early November, when the northbound lane of Hwy. 43 will shift onto the new interchange ramps and the southbound through lane will be routed under the new bridge (see diagram and article on project website). Shifting the traffic will create space for the contractor to build the second through lane under the bridge. In the new stage, southbound traffic will use the right outside lane (not the left lane used now) to access the bridge. This traffic change is planned for Nov. 7-8.

TRAFFIC ALERTS

  • The outside northbound lane of Hwy 43 lane is closed near the driveway to Macadam Bay and Freeman Motors from 9 am to 4 pm on weekdays until Oct. 28 during water line work.
  • Concrete truck deliveries will add to morning congestion on Hwy. 43 on Friday, Oct. 23 and on Tuesday, Oct. 27, weather permitting.
  • In the next several weeks several parking spaces on the south side of SE Spokane St. between SE Oaks Park Way and the driveway to Riverpark condominiums will close temporarily during installation of a storm drain line. No parking signs will be posted in advance.
(more)

Sellwood Bridge Field Work Notice for October 15

Iron workers install bolts on main arch span.

Field Work Notice - Posted October 16, 2015

Major Traffic Change in November

The contractor is preparing for a major traffic change in early November, when the northbound lane of Hwy. 43 will shift onto the new interchange ramps and the southbound through lane will be routed under the new bridge (see diagram and article on project website).  Shifting the traffic will create space for the contractor to build the second through lane under the bridge. In the new stage, southbound traffic will use the right lane (not the left lane used now) to access the bridge. Watch for road signs and email updates about this traffic change tentatively planned for Nov. 7-8.

TRAFFIC ALERTS

  • The outside northbound lane of Hwy 43 lane will be closed near the driveway to Macadam Bay and Freeman Motors from 9 am to 4 pm on weekdays from Oct. 19-28 during work to relocate a water line.
  • Concrete truck deliveries will add to morning congestion on Hwy. 43 on Tuesday, Oct. 20 and Friday, Oct. 23.
  • Later this month several parking spaces on the south side of SE Spokane St. between SE Oaks Park Way and the driveway to Riverpark condominiums will need to be closed temporarily during installation of a storm drain line.
(more)

Sellwood Bridge Field Work Notice for October 9

Aerial view of arch spans

Field Work Update - October 9, 2015

Major Traffic Change in November

The contractor is preparing for a major traffic change in early November, when the northbound lane of Hwy. 43 will shift onto the new interchange ramps and the southbound through lane will be routed under the new bridge (see diagram).  Shifting the traffic will create space for the contractor to build the second through lane under the bridge.

A traffic signal will be repositioned at the west end of the bridge to govern the new traffic flow.  Southbound traffic will use the right outside lane to access the bridge. Traffic headed to River View Cemetery will use a new entrance that lines up with the new interchange.

Watch for road signs and email updates about this traffic change tentatively planned for Nov. 7-8.

(more)

Sellwood Bridge Field Work Notice for September 30

Pouring concrete for NE ramp parapet wall on west side

Field Work Notice - September 30, 2015

TRAFFIC ALERTS

The project team wishes to acknowledge the traffic congestion that impacted many motorists in the project area this week.  Construction impacted commuters more than normal and problems on alternate routes added to the congestion. Traffic flow should improve next week after major paving work is complete.

  • Construction will impact traffic on the bridge, Tacoma St. and Hwy 43 through Sunday, Oct. 4.  Hwy 43 lanes are closed between the bridge and SW Taylors Ferry Road during paving and work near the entrance to Freeman Motors and Macadam Bay. One of the four highway lanes is closed during peak commute hours and two lanes are closed during off-peak daytime hours.  Traffic flow should return to normal after lanes are striped on Sunday, Oct. 4. Drivers should expect delays and consider alternate routes such as the Ross Island Bridge and SW Taylors Ferry Road and SW Terwilliger Blvd.
  • By Monday, Oct. 5, bicyclists and pedestrians will follow the right shoulder of Hwy. 43 between the bridge and SW Taylors Ferry.  The offroad regional trail between the bridge and SW Miles Place will open in 2016.
(more)

Sellwood Bridge Field Work Notice for September 24

Rebar team at work on Span 3 deck

Field Work Notice - September 24, 2015

TRAFFIC ALERTS

Hwy. 43:

  • Hwy. 43 will be reduced to two lanes between the bridge and Freeman Motors from 9 am on Friday, Sept. 25 until Sunday, Sept. 27 during asphalt paving. Drivers may want to consider alternate routes such as the Ross Island Bridge or SW Taylors Ferry and SW Terwilliger during the Friday afternoon commute to avoid delays. The paving is weather-dependent.
  • The existing driveways to Macadam Bay and the south driveway of Freeman Motors will permanently close by noon on Friday, Sept. 25. Between 9 - 10 am the new shared driveway to Macadam Bay and Freeman Motors will open.
  • Bicyclists and pedestrians are using a detour path along the trolley corridor between the bridge and the Macadam Bay driveway, during work on the east shoulder of Hwy. 43. On work days flaggers are positioned at each end of the trail and where the trail passes near construction vehicles. Trail users should remain alert when riding through the busy project area.
(more)

Sellwood Bridge Field Work Notice for September 17

Removing the cofferdam from west river pier

Removing the cofferdam from west river pier

Field Work Notice - Posted September 18, 2015

TRAFFIC ALERTS

Hwy. 43: 

  • Two lanes of Hwy. 43 will be closed from 9 am on Friday, Sept. 18 until 3 pm on Tuesday, Sept. 22 during removal of a median and paving near the new driveway to Freeman Motors and Macadam Bay. Expect delays during the lane closures.
  • Starting on Friday, Sept. 25 at 9 am, the right northbound lane will be closed at Macadam Bay until no later than Tuesday, Sept. 29 at 3 pm. Traffic will be impacted on Sept. 25 – 26 for paving operations north of the bridge.
  • Bicyclists and pedestrians are using a detour path along the trolley corridor between the bridge and the Macadam Bay driveway, during work on the east shoulder of Hwy. 43. On work days flaggers are positioned at each end of the trail and where the trail passes near construction vehicles. Trail users should remain alert when riding through the busy project area.
  • During work on the east shoulder, only three traffic lanes are open between the bridge and the Macadam Bay driveway. Two lanes are open in the peak travel direction and one lane is open in the off-peak direction.
(more)

Sellwood Bridge Field Work Update for September 10

Falsework for Span 3 deck

Field Work Notice - September 10, 2015

TRAFFIC ALERTS

Hwy. 43:

  • Bicyclists and pedestrians have shifted to a detour path along the trolley corridor between the bridge and the Macadam Bay driveway, during work on the east shoulder of Hwy. 43. On work days flaggers are positioned at each end of the trail and where the trail passes near construction vehicles. Trail users should remain alert when riding through the busy project area.
  • During work on the east shoulder, only three traffic lanes are open between the bridge and the Macadam Bay driveway. Two lanes are open in the peak travel direction and one lane is open in the off-peak direction. The fourth lane will reopen in October.
(more)

Sellwood Bridge Field Work Notice for September 3

Installing studs for Span 3 deck

Installing studs for Span 3 deck

Field Work Notice - September 3, 2015

TRAFFIC ALERTS

Hwy. 43: 

  • Bicyclists and pedestrians are seeing the biggest traffic change this week. The path along the east edge of Hwy. 43 between the bridge and the driveway to Macadam Bay has shifted to a new path along the trolley corridor, which includes switchbacks. The change will allow the east shoulder of Hwy. 43 to be rebuilt. On work days flaggers are positioned at each end of the trail and where the trail passes near construction vehicles. Safety fencing has been installed along the trail. Trail users should remain alert when riding through the busy project area.
  • Beginning Tuesday, September 8 there will be only three traffic lanes in use between the bridge and the Macadam Bay driveway, due to reconstruction of the east shoulder. Two lanes will alternate north or south, depending on the peak direction of traffic. One lane will be open in the off-peak direction.  The fourth lane will reopen in October. 
(more)

Revised paving schedule for Sellwood Bridge work

Construction Notice - August 27, 2015

The Sellwood Bridge contractor has revised the paving schedule for this weekend, due to a forecast for rain. Paving is planned for the multi-use path north of the bridge (off the highway) and on new through lanes of Hwy. 43 south of the bridge.

Here is the revised schedule:

  • Friday, Aug. 28: Pave the multi-use path between the bridge and Macadam Bay driveway. Asphalt trucks will entering and exit the work zone during daytime hours.
  • Saturday-Sunday, Aug. 29-30: No paving.
  • Monday-Tuesday, Aug. 31-Sept. 1 (weather permitting): Pave new Hwy. 43 through lanes south of bridge during daytime hours. Northbound traffic will be reduced to one lane south of the bridge.

Sellwood Bridge Field Work Notice for August 27

Retaining walls and onramp in trolley-trail corridor

Retaining walls and onramp in trolley-trail corridor

Field Work Notice - August 27, 2015

TRAFFIC ALERTS

Hwy. 43: 

  • A northbound lane is closed north of the bridge between 9 am and 3 pm on weekdays.
  • A southbound lane is closed at times on weekdays north and south of the bridge from 7 am to 4 pm.
  • Road and trail paving are planned August 28 – 30 (weather permitting) south and north of the bridge. From Friday morning until Sunday evening, northbound traffic will be reduced to one lane south of the bridge.  Rain is forecast for the weekend. An update will be sent out if the weekend work is postponed.
  • The bicycle/pedestrian path between the bridge and the Macadam Bay driveway will be re-routed on Monday, August 31 down to the newly paved path along the trolley line. The detour, which includes switchbacks, will be in place several weeks while a retaining wall along the east side of Hwy. 43 is demolished. Flaggers will direct traffic at the Macadam Bay driveway and at the south end where trail users travel near road and construction traffic.
  • Double lane closures are scheduled north of the bridge from 7 pm – 6 am Monday to Wednesday, August 31 – September 2 during final installation of wire rock fall netting on the hillside north of the retaining walls.
(more)

Sellwood Bridge Field Work Notice for August 21

Hwy 43 through lanes to be paved south of bridge

Hwy 43 through lanes to be paved south of bridge

Field Work Notice - August 21, 2015

TRAFFIC ALERTS

Hwy. 43: 

  • A northbound lane will be closed north of the bridge between 9 am and 3 pm on weekdays at times for the next week
  • A southbound lane will be closed at times on weekdays north and south of the bridge from 7 am to 4 pm
  • A major road paving project is planned August 28 – 30 south of the bridge. From Friday morning until Sunday evening, northbound traffic will be reduced to one lane south of the bridge. 
(more)

Traffic Alert: Upcoming lane closure

August 19, 2015

Related article

Drivers should expect delays crossing the Sellwood Bridge on Thursday, August 20 from 9:30 am to 2 pm, due to construction activity at the east end of the bridge. Flaggers will direct traffic in one open lane during the work.  Travelers can avoid delays by using alternate routes such as the Ross Island Bridge.


Sellwood Bridge Field Work Notice for August 13

Backfilling Stephens Creek culvert for new driveway

Backfilling Stephens Creek culvert for new driveway

TRAFFIC ALERTS

Hwy. 43: 

  • A northbound lane will be closed north of the bridge on Monday, August 17 from 9 am to 3 pm during a concrete pour for the deck of the northeast ramp from the bridge to Hwy 43. Concrete trucks will exit the Macadam Bay driveway onto Hwy. 43, where a flagger will direct traffic.
  • A daytime single lane closure on Hwy. 43 (southbound) is planned from 7 am - 4 pm on weekdays next week.
(more)

Sellwood Bridge Field Work Notice for August 6

Preparing for paving the south side of Tacoma at 6th Ave

Preparing for paving the south side of Tacoma at 6th Ave

Field Work Notice - August 6, 2015

TRAFFIC ALERTS

Hwy. 43: 

  • Night work on Hwy. 43 is postponed until the end of August.  The contractor will need 3 - 4 more nights to finish installation of the rockfall netting.
  • On Friday, Aug. 7 a concrete pour is scheduled to start at 6 am for the deck of the northeast ramp from the bridge to Hwy 43. Crews will arrive at 5 am. During the day 30 concrete trucks will exit the Macadam Bay driveway onto Hwy. 43, where a flagger will direct traffic.
  • A daytime single lane closure on Hwy. 43 (northbound, north of bridge) is scheduled Monday, Aug. 10, from 9 am to 3pm.
  • A daytime single lane closure on Hwy. 43 (southbound) is planned from 7 am - 4 pm on weekdays next week.

SE Tacoma and 6th Ave:  SE 6th Ave. will be closed on the south side of SE Tacoma St. during paving on Friday, Aug. 7.  The road will close before the morning commute and reopen by 5 pm.  SE 7th is the detour.

(more)

Sellwood Bridge Field Work Notice for July 30

Removing old asphalt at 6th & Tacoma

Removing old asphalt at 6th & Tacoma

Field Work Notice - July 30, 2015

TRAFFIC ALERTS

Hwy. 43: 

  • Double lane closures continue north of the bridge next week from 7 pm – 6 am Monday through Thursday for installation of rockfall netting on the hillside north of the retaining walls.
  • One northbound lane of Hwy. 43 is closed weekdays from 9 am to 4 pm.
  • One southbound lane of Hwy. 43 is closed weekdays from 7 am to 4 pm.

SE Tacoma and 6th Ave:  SE 6th Ave. is closed on the south side of Tacoma until late Friday afternoon, July 31 during reconstruction of the intersection.  SE 7th, 8th, and 9th Avenues are alternate routes.  SE 6th Ave. is accessible from SE Tenino, one block south of Tacoma.   From 10 am on Monday, August 3 until late afternoon on Friday, August 7, no left turns will be permitted at the 6th and Tacoma intersection, due to paving in the middle of the intersection. 6th Ave. traffic will be unable to cross Tacoma St. during the week. On Monday, August 3, crews will move concrete barriers near the intersection starting at 3 am to prepare for asphalt grinding starting at 7 am.

(more)

Sellwood Bridge Field Work Notice for July 23

Excavating old lanes of Hwy 43 south of bridge

Field Work Notice - July 23, 2015

TRAFFIC ALERTS

Hwy. 43:

  • Double lane closures continue north of the bridge from 7 pm – 6 am Monday through Thursday for installation of rockfall netting on the hillside north of the retaining walls.
  • One northbound lane of Hwy. 43 is closed weekdays from 9 am to 4 pm.
  • One southbound lane of Hwy. 43 is closed weekdays from 7 am to 4 pm.

SE Tacoma and 6th Ave: SE 6th Ave. will be closed on the south side of Tacoma from 5 am on Monday, July 27 until no later than 4 pm on Friday, July 31 during reconstruction of the intersection. SE 7th will be the alternate route during the closure and access to SE 6th Ave. will be available from SE Tenino, one block south of Tacoma. The closure will impact motor vehicles, bicyclists and pedestrians. SE 8th and SE 9th Avenues are also good alternate routes.

(more)

Sellwood Bridge Field Work Notice for July 17

Many types of retaining walls taking shape north of the bridge

Many types of retaining walls taking shape north of the bridge

Field Work Notice - July 17, 2015

TRAFFIC ALERTS

Hwy. 43:

  • The outside northbound lane of Highway 43 from the Macadam Bay driveway to south of SW Taylors Ferry Road will be closed from 9 a.m. on Friday, July 17 until as late as 3 p.m. on Tuesday, July 21 for construction of the new shared driveway Freeman Motors and Macadam Bay. Northbound drivers should expect delays, especially during the Monday morning commute.
  • Double lane closures continue north of the bridge from 7 pm – 6 am Monday through Thursday for installation of wire rockfall netting on the hillside north of the retaining walls.

SE Tacoma and 6th Ave: Reconstruction of the south lanes of Tacoma and the south side of the 6th and Tacoma intersection has begun. A closure of SE 6th Ave. on the south side of Tacoma is planned from July 27 – 31 to excavate old asphalt and base, install conduit for the new traffic signal and paving. SE 7th will be the alternate route during the closure and access to SE 6th Ave. will be available from SE Tenino, one block south of Tacoma.

(more)

Sellwood Bridge Field Work Notice for July 10

Installing bolts on river span 3.

Installing bolts on river span 3.

Field Work Notice - July 10, 2015

TRAFFIC ALERTS

Hwy. 43:  Double lane closures continue north of the bridge from 7 pm – 6 am Monday through Thursday for installation of wire rockfall netting on the hillside north of the retaining walls.

SE Tacoma and 6th Ave: This week traffic shifted onto the new traffic lanes on the north side of Tacoma between 6th Ave. and the bridge.  Reconstruction of the south lanes of Tacoma and the south side of the intersection has begun. A closure of SE 6th Ave. at Tacoma will be needed for one week later in July for installation of conduit for the new traffic signal and paving. SE 7th will be the alternate route during the closure and access to SE 6th Ave. will be available from SE Tenino, one block south of Tacoma.

(more)

Sellwood Bridge Field Work Notice for July 2

Installing bolts for river spans

Installing bolts for river spans

Field Work Notice - July 2, 2015

TRAFFIC ALERTS

Hwy. 43: 

  • A daytime single southbound lane closure is planned weekdays after 9 am immediately north of the bridge for retaining wall construction.
  • Double lane closures are planned north of the bridge from 7 pm – 6 am weeknights for installation of wire rock netting on the hillside north of the retaining walls.

SE Tacoma and 6th Ave: Traffic has been shifted onto the new traffic lanes on the north side of Tacoma between 6th Ave. and the bridge.  Reconstruction of the north side of the 6th and Tacoma intersection is wrapping up so access to 6th Ave. has improved. The contractor will begin rebuilding the south lanes of Tacoma and the south side of the intersection.  For a look at what the completed intersection will look like, see the rendering shown here.

City of Portland Tacoma paving project:  The Portland Bureau of Transportation’s paving project on SE Tacoma St. east of 17th Ave. is scheduled to end today. Visit this website for details.

(more)

Sellwood Bridge Field Work Notice for June 28, 2015

A panel system is being used for the retaining wall of Hwy 43 north ramp

A panel system is being used for the retaining wall of Hwy 43 north ramp

Field Work Notice - June 28, 2015

TRAFFIC ALERTS

  • Highway 43: Night-time double lane closures are planned Monday through Thursday north of the bridge during installation of anchors for rock protection netting on the hillside.
  • 6th Ave.: SE 6th Ave. will be closed between SE Tacoma St. and SE Spokane St. on weeknights and early mornings, from 11 pm to 10 am during construction of the new traffic signal and intersection next week. Use alternate routes such as 7th, 8th and 9th Avenues. Flaggers are used at SE 6th Ave. and SE Tacoma St. to assist the public when construction vehicles enter or exit this busy work zone.
  • New Sidewalk and Path Open: Bikes and pedestrians are using the new sidewalk on the north side of Tacoma between the bridge and 6th Ave., which includes rows of bricks where public art will be installed in the next year. The path to the bridge sidewalk from SE Grand Ave. has also opened (see photo).
  • Tacoma paving project: The Portland Bureau of Transportation will close traffic lanes on SE Tacoma St. between 17th and Johnson Creek Blvd. on weekdays through July 2. Visit this website for details. This work is not related to the Sellwood Bridge project.
  • Sewer Project on Hwy 43: The City of Portland has begun work on a sewer project along Hwy. 43 south of the Sellwood Bridge project. Visit this website for details. This work is not related to the Sellwood Bridge construction.
(more)

Sellwood Bridge Field Work Update for June 19

View from work bridge with safety deck of new bridge above - June 2015

View from work bridge with safety deck of new bridge above - June 2015

Field Work Notice - June 19, 2015

TRAFFIC ALERTS

For week of June 22 (weekdays):

Hwy. 43: 

  • A daytime single southbound lane closure is planned after 9 am immediately north of the bridge for retaining wall construction.
  • Double lane closures are planned north of the bridge from 7 pm – 6 am for installation of wire rock netting on the hillside north of the retaining walls.

SE Tacoma and 6th Ave: One block of SE 6th Avenue will be closed southbound between SE Spokane St. and SE Tacoma St. from 10 am to 11 pm.  The block will be closed to through traffic from 11 pm to 10 am for night work.  Local access will be provided from Spokane St.  Alternate routes for through traffic are SE 7th, 8th, or 9th Avenues. Flaggers will be present to direct traffic and help construction vehicles enter the work zone.  Please use caution in this area. 

New Tacoma Street sidewalk opens: A new section of sidewalk on the north side of Tacoma Street between SE 6th Ave. and the bridge will open to bicyclists and pedestrians next week.

Tacoma paving project:  The Portland Bureau of Transportation will close traffic lanes on SE Tacoma St. between 17th and 23rd Avenues from June 23 – 26 for paving work. Visit this website for details. This work is not related to the Sellwood Bridge project.

(more)

Sellwood Bridge Field Work Update for June 12

Retaining wall construction

Retaining wall construction

Field Work Notice - June 12, 2015

TRAFFIC ALERTS

Hwy. 43 Lane Closures: For this week:

  • Single lane closure 6 AM to 9 AM on southbound OR-43 north of the bridge for retaining wall work.
  • Double lane closure on OR-43 (north of the bridge) 7 PM – 6 AM for installation of wire mesh on the hillside north of the retaining walls (north of the bridge). Expect delays.
  • All lanes open 4 PM-7 PM

SE Tacoma and 6th Ave:   There will be a lot of work at this intersection next week including:

  • June 15-19 crews will demolish the Northeast corner of SE 6th and Tacoma to install light poles, traffic signal junction boxes and poles,  curbs and sidewalk. 
  • June 15- 19 (days) - the southbound lane of SE 6th Ave between Tacoma and Spokane will be closed to traffic for road reconstruction.  Travelers should use SE 7th Ave as an alternate.  Northbound 6th Ave remains open

Flaggers will be present to direct traffic and help construction vehicles enter the site.  Please use caution in this area. 

Bridge Crane:  Bridge travelers may notice a large crane has been erected on the south side of the new bridge.  This crane will be used to place bridge decking materials for the next several months.  The crane may occasionally swing near the detour bridge eastbound lanes of traffic about 50 feet above.  Also, at night, when not in use, the crane will rotate freely (with the wind).  This free rotation helps reduce stress on the crane created by wind gusts.  There is no risk to those traveling across the bridge.

Willamette River:  As we move into hotter weather, more people are out on the water.  Please remember that the area around the Sellwood Bridge is a NO WAKE zone.  Crews are working on platforms, moving equipment, steel and other components, and wakes can create a safety hazard.  Please lower the speeds on your watercraft when approaching the bridge, so that no wake is created.

City of Portland BES Project: This is a courtesy announcement about another project.  The contractor is installing about 1,000 feet of 24-inch concrete pipe along SW Taylors Ferry Road, 800 feet of 48-inch concrete pipe along SW Virginia Avenue, and permanent odor controls east of SW Taylors Ferry Road There are periodic full closures of Taylors Ferry for this work. For project and closure information visit the BES project website. This work is not related to the Sellwood Bridge project.

(more)

Sellwood Bridge Field Work Update for June 5

Crane installed

Crane installed

Field Work Notice - June 5, 2015

TRAFFIC ALERTS

Hwy. 43 Lane Closures: There will be nighttime double lane closures (7 pm- 6 am) of the southbound outside lane of Hwy 43 beginning June 8 for installation of wire mesh on the hillside north of the retaining walls (north of the bridge).  Flaggers will be present to help direct traffic.  The closures will take place Monday through Thursday nights for four weeks as crews drill anchors and place meshing that will protect against rock falls.

Also this week, expect:

  • Single lane closure 6AM to 9AM on southbound OR-43 north of the bridge
  • Double lane closure on OR-43 (north of the bridge) 9AM-4PM
  • All lanes open 4PM-7PM

Tacoma Street:   Crews are finishing up work on the Northwest corner of SE Tacoma at 6th this week.  Beginning June 15, crews will demolish the Northeast corner of SE 6th and Tacoma to install light poles, curbs and sidewalk.  Flaggers will be present to direct traffic and help construction vehicles enter the site. There are several phases to the work at this intersection, with minor traffic shifts during each phase.  Please use caution in this area. 

Note that from June 22 to July 2, SE 6th Street, north of Tacoma will be closed to traffic to install conduits and storm water facilities, and grade/repave the road.  Travelers should use 7th or 8th streets to access the north side of Tacoma. The road will reopen July 2nd.

City of Portland BES Project: This is a courtesy announcement about another project.  The contractor is installing about 1,000 feet of 24-inch concrete pipe along SW Taylors Ferry Road, 800 feet of 48-inch concrete pipe along SW Virginia Avenue, and permanent odor controls east of SW Taylors Ferry Road There are periodic full closures of Taylors Ferry for this work. For project and closure information visit the BES project website. This work is not related to the Sellwood Bridge project.

Bridge Crane:  Bridge travelers may notice a large crane has been erected on the south side of the new bridge.  This crane will be used to place bridge decking materials for the next several months.  The crane may occasionally swing near the detour bridge eastbound lanes of traffic about 50 feet above. (see photos) Also, at night, when not in use, the crane will rotate freely (with the wind).  This free rotation helps reduce stress on the crane created by wind gusts.  There is no risk to those traveling across the bridge.

(more)

Sellwood Bridge Field Work Update for May 29

Curb work

Curb work

Field Work Notice - May 29, 2015

TRAFFIC ALERTS

Tacoma Street:   Traffic may be delayed on  for short periods on June 2 and June 5th during two concrete pours on the NW corner of SE Tacoma at 6th. Flaggers will be present to direct traffic and help construction vehicles enter the site. Note:  there are several phases to the work at this intersection, with traffic being shifted during each phase.  Please use caution in this area. 

Hwy. 43 Lane Closures: Southbound lane closures are expected next week north of the bridge before 4 pm.

City of Portland BES Project: This is a courtesy announcement about another project.  The contractor is installing about 1,000 feet of 24-inch concrete pipe along SW Taylors Ferry Road, 800 feet of 48-inch concrete pipe along SW Virginia Avenue, and permanent odor controls east of SW Taylors Ferry Road. There will be continuous construction tonight (Friday, May 29) from 8:00 p.m. until construction is complete, no later than 6:00 a.m. Monday, June 1  This work is not related to the Sellwood Bridge project. For information, visit the BES project website.

(more)

Sellwood Bridge Field Work Update for May 22

Bridge arches placed

Bridge arches placed

Field Work Notice - May 22, 2015

TRAFFIC ALERTS

Tacoma Street:  Flaggers continue to direct traffic near 6th Ave. and Tacoma St. when construction trucks are accessing the work zone on the north side of Tacoma St. Note that there are several phases to the work at this intersection, with traffic being shifted during each phase.  Please use caution in this area. 

Hwy. 43 Lane Closures: Southbound lane closures are expected next week north of the bridge before 4 pm.

Sellwood Bridge (east end):  Traffic movements on the bridge may be briefly interrupted Tuesday and Wednesday of next week for removal of traffic barriers.  This will take place after the morning commute

City of Portland BES Project:  The City will continue to work through July on SW Taylors Ferry Road near SW Macadam Ave. This work is not related to the Sellwood Bridge project. For information, visit the BES project website.

(more)

Sellwood Bridge Field Work Update for May 15

Steelworker on east river span

Field Work Notice - May 15, 2015

TRAFFIC ALERTS

Tacoma Street:  Flaggers direct traffic near 6th Ave. and Tacoma St. when construction trucks are accessing the work zone on the north side of Tacoma St.

Hwy. 43 Lane Closures: Southbound lane closures are expected next week north of the bridge before 4 pm.

City of Portland BES Project:  SW Taylors Ferry Road near SW Macadam Ave. will be impacted by city sewer construction this weekend from 8 pm on Friday, May 15 until as late as 6 am on Monday, May 18. A total closure is planned Friday night. This work is not related to the Sellwood Bridge project. For information, visit the BES project website.

(more)

Sellwood Bridge Field Work Notice for May 8

Steelworkers prepare river Span 5 for spandrel columns

Steelworkers prepare river Span 5 for spandrel columns

Field Work Notice - May 8, 2015

TRAFFIC ALERTS

Tacoma Street:  Flaggers direct traffic near 6th Ave. and Tacoma St. when construction trucks are accessing the work zone on the north side of Tacoma St.

Hwy. 43 Lane Closures: Southbound lane closures are expected next week north of the bridge before 4 pm.

City of Portland BES Project:  SW Taylors Ferry Road near SW Macadam Ave. will be impacted by city sewer construction this weekend from 8 pm on Friday, May 8 until as late as 6 am on Monday, May 11. Work is also planned the following weekend. This work is not related to the Sellwood Bridge project. For information, visit the BES project website.

(more)

Sellwood Bridge Field Work Notice for May 1

Deck span

Deck span

Field Work Notice - May 1, 2015

TRAFFIC ALERTS

Hwy. 43 Lane Closures: Southbound lane closures continue next week north of the bridge before 4 pm.

Tacoma Street:  Flaggers direct traffic near 6th Ave. and Tacoma St. when construction trucks are accessing the work zone on the north side of Tacoma St.

Springwater Trail: Flaggers will be detouring bikes and pedestrians during the concrete pour of Span 10 on the east side of the river.

Tacoma Street:  Westbound bicyclists should use caution when approaching the bridge to maneuver onto the detour bridge sidewalk.  Watch for tracks entering and exiting Tacoma from 6th Ave.

(more)

Sellwood Bridge Field Work Notice for April 24

Curve in west approach transition to detour bridge

Curve in west approach transition to detour bridge

Field Work Notice - April 24, 2015

TRAFFIC ALERTS

New Traffic Pattern on West Approach: The bridge reopened at midnight last Saturday, more than a day ahead of schedule, after the contractor shifted traffic onto the west end of the new approach. Bicyclists and pedestrians can now cross Hwy. 43 more easily. The timing of the traffic signal was adjusted after some initial traffic delays on Monday afternoon. Drivers experience a new curve at the west end of the bridge, so remember to travel under the 25 mph speed limit (see photo).

Tacoma Street:  Flaggers direct traffic near 6th Ave. and Tacoma St. when construction trucks are accessing the work zone on the north side of Tacoma St.

Hwy. 43 Lane Closures: Southbound lane closures are expected next week north of the bridge before 4 pm.

(more)

Sellwood Bridge Field Work Notice for April 17

Center arch span with flasework April 2015

Field Work Notice - April 17, 2015

TRAFFIC ALERTS

April 17 – 20 Bridge Closure: The bridge will be closed to all traffic (including bicyclists and pedestrians) from 7 pm on Friday, April 17 until as late as 6 am on Monday, April 20 while the contractor changes the traffic pattern at the west end of the bridge to prepare for the next phase of work. When the bridge reopens, traffic will use the new west approach, which will transition onto the detour bridge. This will allow construction of the ramp from the bridge to northbound Hwy. 43. Highway traffic will not be impacted by the bridge closure.

During the closure, Tacoma St. will be closed to through traffic at 7th Ave., due to work at 6th Ave. and Tacoma St. Tacoma St. can always be crossed at SE 7th Ave.

(more)

Sellwood Bridge Field Work Notice for April 10

View of center arch install from John Hall's kayak

View of center arch install from John Hall's kayak

TRAFFIC ALERTS

April 17 – 20 Bridge Closure: The contractor plans to close the bridge to all traffic from 7 pm on Friday, April 17 until as late as 6 am on Monday, April 20 to implement a traffic pattern change at the west end of the bridge and install pre-cast concrete deck girders for the east approach.  When the bridge reopens, traffic will use the new west approach which will transition onto the detour bridge. This will allow construction of the ramp from the bridge to northbound Hwy. 43. Highway traffic will not be impacted by the bridge closure. The contractor will complete the transition structure from the detour bridge to the new west approach this week.

During the closure, Tacoma St. will be closed to through traffic at 7th Ave., due to work at 6th Ave. and Tacoma and staging for the girder installation. Tacoma St. can always be crossed at SE 7th Ave.

Hwy. 43 Lane Closures: Lane closures in both directions are planned all next week south of the bridge from 9 am to 4 pm during installation of storm drain pipe across Hwy 43. North of the bridge, the outside southbound lane will be closed during the week from 7 am to 4 pm during work on drainage structures on the slope above the retaining walls.

Springwater Trail:  The trail will be closed for a few minutes at a time on Wednesday, April 15 under the bridge. Flaggers will direct traffic when the trail is closed.

(more)

Sellwood Bridge Field Work Notice for April 3

Light installation on spans 1 and 2.

Light installation on spans 1 and 2.

Field Work Notice - April 3, 2015

TRAFFIC ALERTS

April 17 – 20 Bridge Closure: The contractor plans to close the bridge to all traffic from 7 pm on Friday, April 17 until as late as 6 am on Monday, April 20 to implement a traffic pattern change at the west end of the bridge and install deck girders for the east approach.  When the bridge reopens, traffic will use the new west approach which will transition onto the detour bridge. This will allow construction of the ramp from the bridge to northbound Hwy. 43. Highway traffic will not be impacted by the bridge closure.

Hwy. 43 traffic impacts: Lane closures are planned from 7am to 4 pm next week in the southbound outside lane north and south of the bridge during finish work on retaining walls and installation of gutters behind the walls (see photo). Thursday and Friday of this week crews will be placing a drain across Hwy 43. Work will start at 9 am and will affect both northbound and southbound traffic south of the bridge on Hwy 43.

Tacoma Street:  Work to widen and rebuild the south side of SE Tacoma St. between SE 6th Avenue and the bridge begins Monday.  There will be some shifts to traffic lanes and pedestrian/bicycle routes in the next few months as a result of this work. A temporary “no parking zone” will be established on April 20th on the south side of Tacoma from 6th Avenue east to realign eastbound traffic. There will be intermittent construction traffic on SE Grand Avenue between Spokane St. & SE Tacoma St.  In addition, Portland Water Bureau will start Monday on waterline work on Tacoma St.  This work will continue for a few weeks.

The Springwater Trail between SE Umatilla St. & SE Spokane St. will be closed on Wednesday (4/8) and Thursday (4/9) from 7:30am – 4:00pm for Bent 11 construction activity. Flaggers will assist cyclists and pedestrians

(more)

Sellwood Bridge Field Work Notice for March 27

Installing rebar for crossbeam on east approach, 3-2015

Installing rebar for crossbeam on east approach, 3-2015

Field Work Notice - March 27, 2015

TRAFFIC ALERTS

April 17 – 20 Bridge Closure: The contractor plans to close the bridge to all traffic from 7 pm on Friday, April 17 until as late as 6 am on Monday, April 20 to implement a traffic pattern change at the west end of the bridge and install deck girders for the east approach.  When the bridge reopens, traffic will use the new west approach which will transition onto the detour bridge. This will allow construction of the ramp from the bridge to northbound Hwy. 43. Highway traffic will not be impacted by the bridge closure.

Hwy. 43 traffic impacts:

  • Lane closures are planned from 9 am to 4 pm next week in the southbound outside lane north and south of the bridge during finish work on retaining walls and installation of gutters behind the walls.
  • The outside northbound lane will be closed next week from 7 am to 4 pm between the bridge and Freeman Motors during work to connect the new 36-inch waterline.
(more)

Sellwood Bridge Field Work Notice for March 20

Arch segments installed in sequence, 3-2015

Arch segments installed in sequence, 3-2015

Field Work Notice - March 20, 2015

TRAFFIC ALERTS

April Bridge Closure: The contractor plans to close the bridge to all traffic from 7 pm on Friday, April 17 until as late as 6 am on Monday, April 20 to implement a traffic pattern change at the west end of the bridge.  When the bridge reopens on April 20, traffic will use the new west approach which will transition onto the detour bridge. This will allow construction of the ramp from the bridge to northbound Hwy. 43. Highway traffic will not be impacted by the weekend bridge closure.

Bridge delays on March 24:  Sellwood Bridge traffic will be delayed at times on Tuesday between 9 am and 4 pm during installation of heavy steel segments for one of the arch spans. Delays of up to 20 minutes (including sidewalks) may be needed. Bridge users may want to consider alternate routes to avoid delays.

Hwy. 43 traffic impacts:

  • Lane closures are planned from 9 am to 4 pm next week in the southbound outside lane south of the bridge during finish work on the concrete walls.
  • The outside northbound lane will be closed next week from 7 am to 4 pm north of the bridge during work to connect the new 36-inch waterline.

Springwater Trail:  The trail will be closed under the bridge from 7:30 am to 4 pm Wednesday to Friday, March 25 – 27 during work on the east abutment wall.  Flaggers will direct trail users to the alternate route on SE 7th Ave. where a crosswalk crosses SE Tacoma St.

(more)

Sellwood Bridge Field Work Notice for March 13

Span 2 deck concrete pour

Span 2 deck concrete pour

Field Work Notice - March 13, 2015

TRAFFIC ALERTS

Bridge traffic delays:  Sellwood Bridge traffic will be delayed at times on Monday, March 16 between 9 am and 4 pm during installation of heavy steel arch segments for the east span of the new bridge.  Delays of up to 20 minutes (including sidewalks) may be needed during installation. Bridge users may want to consider alternate routes to avoid delays.

Hwy. 43 traffic impacts:

  • Lane closures are planned next week in the southbound outside lane north of the bridge during finish work on the concrete walls.
  • Lane closures are planned next week for northbound traffic south of the bridge during installation of large concrete blocks for a new retaining wall.

Springwater Trail:  On Saturday morning, March 14 the trail will be closed under the bridge during installation of panels for the east abutment wall.  Signs will direct trail users to the alternate route.

(more)

Sellwood Bridge Field Work Notice for March 6

Setting rebar for east approach crossbeam

Setting rebar for east approach crossbeam

Field Work Notice - March 6, 2015

TRAFFIC ALERTS

Bridge traffic delays:  Sellwood Bridge traffic will be delayed at times March 9 – 11 during installation of heavy steel arch segments for the east span of the new bridge.  Delays of up to 20 minutes (including sidewalks) may be needed at these times: Monday from 12 – 4 pm; Tuesday from 9 am to noon; Wednesday from 9 to 4 pm. Bridge users may want to consider alternate routes to avoid delays.

Hwy. 43 traffic impacts:

  • Lane closures are expected next week in the southbound outside lane north of the bridge during finish work on the concrete walls.
  • Lane closures are expected next week for northbound traffic south of the bridge during delivery and installation of large concrete blocks for a new retaining wall.
(more)

Sellwood Bridge Field Work Notice for February 27

Moment slab along edge of southeast ramp

Field Work Notice - February 27, 2015

TRAFFIC ALERTS

Hwy. 43 traffic impacts: Lane closures are expected next week in the southbound outside lane north and south of the bridge to install street light poles, traffic signal poles and aerial spans. A new traffic signal is being set up for the next traffic stage in May. That stage will shift traffic onto the west end of the new bridge, to allow the northbound ramp to be built.

South of the bridge the outside northbound lane will be closed at times next week when large concrete blocks will be offloaded and installed for a retaining wall on the southeast ramp.

A major concrete pour is planned on Wednesday, March 4 for the deck of Span 2, with increased concrete truck deliveries that day.

North of the bridge, trail and motor vehicle traffic may experience brief delays due to waterline work along the east edge of Hwy. 43. Flaggers will direct trail traffic at times.

Spokane Street/6th Ave. Parking: A no parking zone will be established on March 5 – 6 at locations along SE 6th Ave. near SE Spokane St. and on Spokane between 6th Ave. and SE Oaks Parkway. The parking spaces need to be closed on days when large construction cranes will be delivered for erection of the east side steel arch span.

(more)

Sellwood Bridge Field Work Notice for February 20

Trail through waterline work zone north of bridge

Field Work Notice - February 20, 2015

TRAFFIC ALERTS

Hwy. 43 traffic impacts: Trail and motor vehicle traffic north of the bridge may experience brief delays next week due to waterline work along the east edge of Hwy. 43. The outside northbound lane will be closed at some off-peak times to allow exiting dump trucks to accelerate safely onto the highway (see photo). Trail users may be asked to wait at times for trucks and equipment to be cleared from the trail.

City Sewer Project on Taylors Ferry Road: Many people contacted us this week to ask about new construction signs seen on Taylors Ferry Road. These are for a City of Portland sewer project that is not related to the Sellwood Bridge project. The City project will require Taylors Ferry Road between Macadam Ave. and nearby Stephens Creek to be closed on weeknights from 8 pm to 6 am starting Feb. 23 for up to four months. For more information, visit the project website.

(more)

Sellwood Bridge Field Work Notice for February 13

Demolishing Hwy 43 retaining wall

Demolishing Hwy 43 retaining wall

Field Work Notice - February 13, 2015

TRAFFIC ALERTS

Hwy. 43 traffic impacts: There will be short-term closures of the outside southbound lane north of the bridge for installation of streetlight pole foundations and lights. Trail traffic north of the bridge may experience brief delays next week due to waterline work along the east edge of Hwy. 43.  The outside northbound lane will be closed at some off-peak times to allow exiting dump trucks to accelerate safely onto the highway.

(more)

Sellwood Bridge Field Work Notice for February 6

Installation of waterline north of bridge

Installation of waterline north of bridge

Field Work Notice - February 6, 2015

TRAFFIC ALERTS

Hwy. 43 traffic impacts: There will be short-term closures of lanes near the west end of the bridge at times next week during installation of two traffic signal poles. Trail traffic just north of the bridge may experience brief delays next week due to waterline work along the east edge of Hwy. 43.  Flaggers will direct trail traffic at these times. Additional lane closures may be needed on Hwy. 43 during off-peak hours next week.

(more)

Sellwood Bridge construction traffic alert for February 4

Related articles

Traffic on Highway 43 near the Sellwood Bridge will be impacted by construction activity most of the day on Wednesday, February 4. Work will begin before the morning commute and may continue into the evening. A contractor will need to shift traffic lanes and perform a number of tasks as highway lanes north of the bridge shift west against new retaining walls. A concrete pour for the new bridge is also scheduled. Drivers should expect delays on the bridge and Highway 43 throughout the day as crews remove old striping, add new striping, install barriers and fencing. The shift will allow crews to construct the east side of the interchange. Drivers may want to use alternate routes such as the Ross Island Bridge or SW Terwilliger Blvd. on Wednesday.


Sellwood Bridge Field Work Notice for Jan. 30

Preparing east approach foundation for transition pour Jan 2015

TRAFFIC ALERTS

Springwater Trail: The trail has reopened between Spokane St. and Umatilla St. but trail users may experience short delays during construction of the east approach. Flaggers will direct trail traffic during work near the trail.

Hwy. 43 lane closures: The outside southbound lane of Hwy. 43 is closed weekdays and Saturdays until 4 p.m. between SW Taylors Ferry Road and the bridge while the contractor works on the west side of traffic lanes. Work next week includes grading, paving and installation of streetlight poles.

February 7 Traffic Change: A major traffic change takes place on Hwy. 43 on Saturday, Feb. 7 when traffic lanes will be shifted west against the new retaining walls north of the bridge. This will be a good day to avoid Hwy. 43, as the contractor will be removing old striping, placing new striping, installing traffic barriers and chain link fence. Work on Friday, Feb. 6 will also impact traffic in this area. The traffic shift will allow the contractor to build the east side of the interchange and relocate a waterline.

(more)

Sellwood Bridge Field Work Notice for Jan. 23

Installing girders for southeast ramp, Jan 2015

Installing girders for southeast ramp, Jan 2015

Field Work Update - January 23, 2015

TRAFFIC ALERTS

Springwater Trail:  The trail is closed between Spokane St. and Umatilla St. until Jan. 31 while a contractor drills foundation shafts for the abutment of the east approach.  A detour using SE 7th Ave. is in place during the closure.

Hwy. 43 lane closures: The outside southbound lane of Hwy. 43 is closed weekdays and Saturdays until 4 p.m. between SW Taylors Ferry Road and the bridge while the contractor works on the west side of traffic lanes. On Thursday, Jan. 29 a southbound lane will be closed south of the bridge when light poles are installed behind the retaining walls. 

February 7 Traffic Change:  A major traffic change takes place on Hwy. 43 on Saturday, Feb. 7 when traffic lanes will shift west against the completed retaining walls north of the bridge.  This will be a good day to avoid Hwy. 43, as the contractor will be removing old striping, placing new striping, installing traffic barriers and chain link fence.  The traffic shift will allow the contractor to build the east side of the interchange and relocate a waterline.

(more)

Sellwood Bridge Field Work Notice for Jan. 16

Chair Kafoury & staff tour Sellwood Bridge, Jan 2015

Chair Kafoury & staff tour Sellwood Bridge, Jan 2015

Field Work Update - January 16, 2015

TRAFFIC ALERTS

Springwater Trail: A section of the trail between Spokane St. and Umatilla St. will be closed for two seeks starting Monday, Jan. 19 when foundation shafts for the abutment are being drilled.  A detour using SE 7th Ave. will be in place during the closure.

Hwy. 43 lane closures: The outside southbound lane of Hwy. 43 is closed weekdays and Saturdays until 4 p.m. between SW Taylors Ferry Road and the bridge while the contractor works on the west side of traffic lanes. On Tuesday, Jan. 20 a southbound lane will be closed south of the bridge when concrete is poured for light pole foundations.

(more)

Alert: Tacoma St. construction to impact traffic Jan. 14 - 16

Construction for a private residential project will impact traffic on SE Tacoma St. near SE 6th Ave. from 9 a.m. to 3 p.m. January 14 - 15 and possibly on January 16. Two traffic lanes on Tacoma St. will be closed during excavation for a sewer line. During work hours flaggers will direct traffic on a single open lane on the south side of Tacoma St. This work is not part of the Sellwood Bridge project but it will add to traffic congestion near the bridge. Travelers may want to consider alternate routes such as the Ross Island Bridge to avoid delays during this work.


Sellwood Bridge Field Work Notice for Jan. 9

Setting rebar cage for east approach foundation

Setting rebar cage for east approach foundation

Field Work Update - January 9, 2015

TRAFFIC ALERTS

Springwater Trail: Flaggers will control traffic on the trail under the bridge between Spokane St. and Umatilla St. during work hours the week of Jan. 12 while the drilling contractor accesses the east abutment area.  Trail users may be delayed a few minutes at times.  This section of the trail will be closed for two weeks starting January 19 when the foundation shafts for the abutment are being drilled.  A detour using SE 7th Ave. will be posted during the closure.

Hwy. 43 lane closures: The outside southbound lane of Hwy. 43 is closed weekdays and Saturdays until 4 p.m. between SW Taylors Ferry Road and the bridge while the contractor works on the west side of traffic lanes. A northbound lane will be closed south of the bridge next week during installation of concrete girders for the southeast ramp, a concrete pour for light pole foundations, earthwork and storm drain installation.

(more)