The following documents may require special programs to run. If you do not have
the programs that are listed, please refer to the
File Formats page to download these programs.
|
|
|
|
|
|
|
Agenda (PDF, 32KB)
|
|
Presentation from the Bridge Type Working Group (PDF, 1.88MB)
|
|
Open House #4 Summary (PDF, 139KB)
|
|
Survey #4 Summary (PDF, 335KB)
|
|
Meeting Notes (PDF, 62KB)
|
|
|
|
Agenda (PDF, 33KB)
|
|
Bridge Type Presentation (PDF, 2.20MB)
|
|
Updated Project Schedule (PDF, 42KB)
|
Meeting Notes (PDF, 54KB)
back to top
|
|
|
|
Agenda (PDF, 33KB)
|
|
Comparison of the CTF and PAG Alternatives (PDF, 35KB)
|
|
Bridge Type Attributes Handout (PDF, 47KB)
|
|
Bridge Type Analysis Handout (PDF, 37KB)
|
|
Finance and Revenue Analysis Presentation (PDF, 337KB)
|
|
Bridge Type Presentation (PDF, 722KB)
|
Meeting Notes (PDF, 68KB)
back to top
|
On September 17th the CTF members agreed to recommend the following alternatives to the
PAG for their concurrence or revisions (during the PAG's October 1st meeting).
Recommended alternatives are:
- Yellow center alignment rehabilitation with a two lane cross-section (L, 57 feet wide) and signal
at the west end
- Yellow south replacement alignment with a two lane cross-section (C, 64 feet wide)
and signal at the west end
- Purple replacement alignment with a three lane cross-section (modified
version of K, 57 feet wide on the top for vehicles and 20 foot wide lower deck for bike/peds only) and signal at
the west end
- Teal-Pink hybrid replacement, which would combine the Pink alignment on the
east side with Teal on the west side, alignment with a four lane cross-section (D, 75 feet wide, two lanes for autos
and two lanes for transit only) and signal at the west end
More information is provided in the Alternatives Recommended for the Draft Environmental
Impact Statement Memo and the Meeting Notes from the September 17 CTF meeting, which
will be added soon.
|
|
Agenda (PDF, 29KB)
|
|
Roundabout Evaluation Memo (PDF, 1.16MB)
|
|
Survey #3 Summary (PDF, 326KB)
|
|
Public Comments - email comments about the alternatives, July 25 through September 11 (PDF, 107KB)
|
|
Sellwood in the News - review of recent articles (PDF, 81KB)
|
|
PowerPoint Presentation (PDF, 2.10MB)
|
Meeting Notes (PDF, 111KB)
back to top
|
|
|
|
Agenda (PDF, 33KB)
|
|
Alternatives Evaluation Findings Memo - Draft (PDF, 1.10MB)
|
|
Criteria Contributions toward the Rank and Score (PDF, 29KB)
|
|
Sensitivity Analysis for Residential Relocation Weighting (PDF, 30KB)
|
|
Updated Weightings - Right of Way Cost Adjustments (PDF, 21KB)
|
|
Updated Weightings - Alternative Ranks (PDF, 20KB)
|
Meeting Notes - (PDF, 118KB)
back to top
|
These materials include a large amount of data and findings, including information on estimated
costs for the different alternatives. Please note that cost estimates are for the 75 year life-cycle
of each alternative. The CTF chose evaluation criteria that focus on life-cycle cost rather than
construction cost alone. Estimates are in 2012 dollars. Cost estimates include:
- Construction unit costs
- Right of Way (including relocations)
- Engineering (design and construction phases)
- Maintenance (for 75 years)
|
|
Agenda (PDF, 28KB)
|
|
Alternative Evaluation Methodology Memo (PDF, 611KB)
|
|
Alternative Evaluation Presentation (PDF, 890KB)
|
|
Evaluation Results Spreadsheet (PDF, 28KB)
|
|
Cross Sections - Advanced (PDF, 262KB)
|
Meeting Notes (PDF, 97KB)
back to top
|
|
|
|
Agenda (PDF, 31KB)
|
|
Comparison of Alignment Characteristics (PDF, 187KB)
|
|
Comparison of Cross Sections (PDF, 292KB)
|
|
Representative Cross-Views of Various Bridge Widths (PDF, 143KB)
|
|
Representative Cross-Views of Double Deck Bridges (PDF, 1.19MB)
|
|
Comparison of Double Deck Cross Section Characteristics (PDF, 81KB)
|
|
Other Public Concepts (PDF, 79KB)
|
|
Survey 2 Summary (PDF, 95KB)
|
Meeting Notes (PDF, 174KB)
back to top
|
|
|
|
Agenda (PDF, 32KB)
|
|
PowerPoint Presentation of New Alignments (PDF, 1.69MB)
|
|
Tunnel vs. Bridge Matrix (PDF, 90KB)
|
|
Interchange Matrix (PDF, 90KB)
|
|
April 4 Workshop Summary (PDF, 166KB)
|
|
Survey 2 Summary (PDF, 95KB)
|
Meeting Notes (PDF, 147KB)
back to top
|
|
|
|
Agenda (PDF, 34KB)
|
Meeting Notes (PDF, 153KB)
back to top
|
|
|
|
Final Results (PDF, 15KB)
|
|
|
|
Agenda (PDF, 20KB)
|
|
Project glossary of terms - explains the project acronyms, groups, agencies, and bridge terms (PDF, 23KB)
|
|
Modal Considerations and Potential Bridge Cross-Sections Memo (PDF, 243KB)
|
|
Modal Considerations PowerPoint Presentation (PDF, 1.25MB)
|
|
Seismic Design Handout (PDF, 62KB)
|
Meeting Notes (PDF, 140KB)
back to top
|
|
|
|
Agenda (PDF, 27KB)
|
|
Evaluation Criteria - Working Draft, changes made at January 22 meeting are shown in track changes (PDF, 77KB)
|
|
Threshold Criteria - Working Draft, changes made at January 22 meeting are shown in track changes (PDF, 44KB)
|
|
Meeting Notes (PDF, 126KB)
|
|
|
|
Agenda (PDF, 38KB)
|
|
Threshold Criteria
- Working Draft, changes made at December 11 meeting are shown in track changes (PDF, 44KB)
|
|
Evaluation Criteria
- Working Draft, changes made at December 11 meeting are shown in track changes (PDF, 111KB)
|
Meeting Notes (PDF, 117KB)
back to top
|
|
|
|
Agenda (PDF, 202KB)
|
|
Public Comments Related to the Evaluation Framework
(PDF, 67KB)
|
|
Meeting Notes
(PDF, 144KB)
|
|
|
|
Agenda(PDF, 229KB)
|
|
Revised Purpose and Need
- Draft (PDF, 53KB)
|
|
Recommended Purpose and Need
- Recommended to the Policy Advisory Group for adoption (PDF, 53KB)
|
|
Evaluation Framework Presentation
(PDF, 287KB)
|
|
Evaluation Framework Memo
(PDF, 222KB)
|
|
Roadway Standards - Hwy 43
- Draft (PDF, 66KB)
|
|
Roadway Standards - Ramps
- Draft (PDF, 58KB)
|
|
Roadway Standards - Tacoma
- Draft (PDF, 107KB)
|
|
Tacoma Collision Memo
- Additional information provided to supplement the Safety
Memo from the September 18 meeting (PDF, 51KB)
|
|
Distinguishing Repair, Rehabilitation, and Replacement
(PDF, 42KB)
|
|
Open House Summary
- A review of the Open House that was held on October 25,
2006 (PDF, 282KB)
|
|
Scoping Issues Summary Table
- summary of public comments (PDF, 86KB)
|
|
"Community Values and Issues" Survey Summary
- Posted online from September to mid-October 2006 (PDF, 27KB)
|
Meeting Notes
(PDF, 419KB)
back to top
|
|
|
|
Agenda(PDF, 232KB)
|
|
Revised Purpose and Need
- Draft (PDF, 58KB)
|
|
Meeting Notes
(PDF, 395KB)
|
|
|
|
Agenda(PDF, 203KB)
|
|
Safety Memo
- Draft (PDF, 273KB)
|
|
Metro Study Presentation (PDF, 384KB)
|
|
Comparison of Bridge Rehabilitation vs. Replacement Concepts
- Draft (PDF, 982KB)
|
|
Bridge Rehabilitation vs. Replacement Presentation (PDF, 880KB)
|
|
Meeting Notes
(PDF, 387KB)
|
|
|
|
Agenda(PDF, 74KB)
|
Sellwood Bridge
Structural Deficiencies Memo
- Draft (PDF, 785KB)
This document has been finalized and is stored in the project library.
|
Sellwood Bridge
Roadway Deficiencies Memo -
Draft (PDF, 730KB)
This document has been finalized and is stored in the project library.
|
|
Public and Agency
Involvement Plan Overview
- Draft (PDF, 150KB)
|
|
Purpose and Need Presentation (PDF, 164KB)
|
|
Purpose and Need
Public Comments (PDF, 54KB)
|
Meeting Notes
(PDF, 414KB)
back to top
|
|
|
|
Agenda(PDF, 232KB)
|
|
Meeting Notes
(PDF, 420KB)
|
|
|
|
|
|
|
|
|
Agenda
(PDF, 52KB)
|
|
Presentation
(PDF, 5.45MB)
|
|
Open House #4 Summary (PDF, 139KB)
|
|
Survey #4 Summary (PDF, 335KB)
|
|
|
|
Agenda
(PDF, 60KB)
|
Alternatives Recommended for the
Draft Environmental Impact Statement Memo
- as recommended by the CTF (PDF, 544KB)
|
|
NEPA process review presentation
(PDF, 389KB)
|
|
CTF recommendations to the PAG presentation
(PDF, 471KB)
|
|
SAS comments to the PAG presentation
(PDF, 857KB)
|
|
Results of the PAG meeting
- Press release from Maria Rojo de Steffey (PDF, 136KB)
|
|
|
|
Agenda
(PDF, 57KB)
|
|
Range of Alternatives Presentation
(PDF, 4.80MB)
|
|
Recommended Concepts for Advancement Memo - result of the April and May Community Task Force meetings
(PDF, 1.74MB)
|
Meeting Summary
(PDF, 65KB)
back to top
|
|
|
|
Agenda
(PDF, 53KB)
|
|
Evaluation Framework
- adopted changes by the Policy Advisory Group are shown in track changes (PDF, 360KB)
|
|
Meeting Summary
(PDF, 58KB)
|
|
|
|
Agenda
(PDF, 60KB)
|
|
Purpose and Need Presentation
(PDF, 2.47MB)
|
|
Purpose and Need
- Draft (PDF, 53KB)
|
Purpose and Need
- Adopted by the Policy Advisory Group (PDF, 54KB)
|
|
Meeting Summary
(PDF, 72KB)
|
|
|
|
Agenda
(PDF, 77KB)
|
|
Kick-off Presentation
(PDF, 2.20MB)
|
Meeting Summary (PDF, 79KB)
back to top
|
|
|
|
|
|
Right of Way Presentation - This is a presentation about the Right of Way impacts on the
east and west sides of the Willamette River, for the five alternatives that are being studied in the draft
environmental impact statement (draft EIS). (PDF, 1.51MB)
|